SAUDI TELECOM COMPANY,KINGDOM OF SAUDI ARABIA vs. ASSISTANT COMMISSIONER OF INCOME TAX, INTERNATIONAL TAXATION, CIRCLE-2(2), BENGALURU
In favour of the assessee: the assessee's appeal was allowed. From the AI summary of this appeal.
What did the Tribunal hold?
The Tribunal first admitted the additional ground regarding the validity of DRP directions issued without DIN, following the Supreme Court's judgment in M/s National Thermal Power Co. Ltd. However, as the primary issue regarding the capacity transfer addition was decided on merits, this additional ground became academic. The Tribunal dismissed the grounds related to reassessment jurisdiction and interconnect charges as not pressed. On the main issue of capacity transfer, the Tribunal held that the revenue failed to discharge its onus to prove that any taxable event occurred in AY 2012-13. The AO's basis for taxation was the commencement of the EIG project in FY 2011-12, but the revenue did not provide concrete evidence to substantiate this claim or refute the assessee's evidence, including an email from the EIG Management Committee Chairman confirming commencement in February 2011. The Tribunal noted that the AO sought further time to submit a conclusive report, indicating a lack of supporting material. Citing the Supreme Court's decision in K.P. Varghese v. ITO, the Tribunal held that the assessee cannot be burdened with proving a negative. Therefore, the addition of Rs. 102 crores was deleted as there was no basis for taxation in AY 2012-13. Grounds 15-17 (consequential) were also rendered academic.
What were the facts?
The assessee, Saudi Telecom Company, a non-resident, is in appeal against the final assessment order for Assessment Year (AY) 2012-13. The Assessing Officer (AO) initiated reassessment proceedings under Section 147, proposing additions for interconnect charges received from Vodafone (Rs. 14,85,668) and capacity transfer payments from Dishnet (Rs. 102,02,00,000). The assessee objected before the Dispute Resolution Panel (DRP), which upheld the AO's additions. The assessee's appeal to the Income Tax Appellate Tribunal (ITAT) challenges the AO's order passed pursuant to DRP directions. During the proceedings, the assessee did not press grounds related to reassessment jurisdiction and interconnect charges. The primary dispute concerns the addition of Rs. 102 crores received from Dishnet for capacity transfer in the Europe India Gateway (EIG) cable system.
What were the issues?
1. Whether the reassessment proceedings initiated under Section 147 of the Income-tax Act, 1961, are valid? (Mixed law and fact) 2. Whether the addition of interconnect charges of Rs. 14,85,668 is justified? (Mixed law and fact) 3. Whether the addition of Rs. 102,02,00,000 received towards capacity transfer from Dishnet is taxable in AY 2012-13? (Mixed law and fact, concerning Section 5 of the Act and Article 12 of the India-Saudi Arabia DTAA) 4. Whether the DRP directions issued without a Computer-Generated Document Identification Number (DIN) are invalid? (Purely legal) Assessee's contentions: - The reassessment proceedings and the addition for interconnect charges are not pressed. - The addition for capacity transfer is not taxable in AY 2012-13 as no taxable event occurred in that year. All relevant milestone events occurred prior to AY 2012-13, and Dishnet ultimately went into insolvency. The AAR ruling in Dishnet's case is not binding. Evidence was submitted to show only USD 5,749,961 was received and the cable commenced operation in February 2011. - DRP directions without DIN are invalid (additional ground). Revenue's contentions: - The AO held that the EIG project commenced in FY 2011-12, making the entire USD 20 million (Rs. 102 crores) taxable as royalty in AY 2012-13, relying on the AAR ruling in Dishnet's case, which was considered binding. The DRP upheld the addition, finding the assessee's evidence insufficient.
Which sections of the Income-tax Act were involved?
Section 147,Section 144(C),Section 191,Section 148,Section 234B,Section 234C,Section 271(1)(b),Section 271(1)(c),Section 5
AI-generated summary — verify with the full judgment below
Income Tax Appellate Tribunal, “A” BENCH : BANGALORE
Before: SHRI N.V. VASUDEVAN & Ms. PADMAVATHY S
IN THE INCOME TAX APPELLATE TRIBUNAL “A” BENCH : BANGALORE BEFORE SHRI N.V. VASUDEVAN, VICE PRESIDENT AND Ms. PADMAVATHY S, ACCOUNTANT MEMBER
IT(IT)A No.797/Bang/2022 Assessment year : 2012-13
Saudi Telecom Company, Vs. The Assistant Building 2: Finance Sector, Commissioner of Income STC Head Office, P.O. Box 87912, Tax Almursalat District, Riyadh – 11652. (International Taxation), Kingdom of Saudi Arabia. Circle 2(2), PAN: ABFCS 1518N Bengaluru. ASSESSEE RESPONDENT
Assessee by : S/Shri Sriram Seshadri & Aliasgar Rampurawala, CAs, Manju Prasad, AR Respondent by : Shri K. Sankar Ganesh, Jt.CIT(DR)(ITAT), Bengaluru.
Date of hearing : 30.01.2023 Date of Pronouncement : 06.02.2023
O R D E R Per Padmavathy S., Accountant Member This appeal is against the final order of assessment by the ACIT, Circle 2(2), Bangalore passed u/s. 147 r.w.s. 144(C) of the Income-tax Act, 1961 [the Act] dated 14.7.2022 for AY 2012-13.
IT(IT)A No.797/Bang/2022 Page 2 of 14
The assessee is a non-resident telecommunication operator headquartered in Saudi Arabia. The AO noticed that the assessee has received a payment of Rs.14,85,668 from M/s. Vodafone South India Ltd during the previous year 2011-12 towards inter connect charges and that the income was held to be chargeable to tax in India as royalty in the proceedings u/s. 201 of Vodafone. The AO on examination of records was of the view that the said income received by the assessee is chargeable to tax in India and since Vodafone has not deducted tax at source held that the tax needs to be paid by the assessee as per the provisions of section 191. Accordingly, the AO invoked the provisions of section 147 and issued a notice u/s. 148 on the assessee. The AO in the revision proceedings held the following amounts to be taxed in the hands of the assessee in India:
(i) Interconnect charges received from Vodafone – Rs.14,85,668 (ii) Amount received towards capacity transfer from Dishnet – Rs.102,02,00,000
Aggrieved, the assessee raised objections before the DRP contending the legality of the revisionary proceedings and also the issue on merits. The DRP dismissed the objections raised by the assessee and upheld the additions made by the AO. The assessee is in appeal before the Tribunal against the final order of assessment passed by the AO in accordance with the directions of the DRP.
IT(IT)A No.797/Bang/2022 Page 3 of 14
The assessee raised grounds pertaining to the following issues :
Ground No.1 – General Ground Nos. 2 to 5 – Jurisdiction of reassessment u/s. 147 Ground Nos.6 to 8 – Addition towards interconnect charges Ground Nos. 9 to 14 – Addition towards payments received under capacity transfer agreement Ground No.15 – Interest u/s. 234B & 234C of the Act. Ground Nos. 16 & 17 – Levy of penalty u/s. 271(1)(b) & 271(1)(c) Additional Ground - DRP directions not quoting computer- generated DIN on the body of directions u/s. 144C(5) is invalid.
The ld. AR submitted that additional grounds challenging the validity of the said DRP Directions issued without a DIN and Impugned Order passed pursuant to the said Directions are purely legal in nature and the same may be admitted for adjudication. Reliance was placed on Jute Corporation of India Ltd. [187 ITR 688 (SC)] and other judgments.
After hearing both the parties, following the Hon’ble Supreme Court judgment in the case of M/s National Thermal Power Co. Ltd. Vs. CIT, 229 ITR 383 (SC), the additional ground is admitted for adjudication.
The ld. AR submitted before the bench that grounds pertaining to the validity of reassessment proceedings u/s.147 and grounds pertaining to the interconnect charges are not pressed. Accordingly, these grounds are dismissed as not pressed.
IT(IT)A No.797/Bang/2022 Page 4 of 14
During the course of hearing, the ld. AR and the ld. DR presented detailed arguments with regard to the directions of DRP u/s. 144C(5) being issued without DIN in the body of the order and the validity of the same. Both the parties also presented arguments contending the issue of addition made towards payments received towards capacity transfer by the assessee on merits. For the purpose of adjudication, we will first consider the arguments presented with regard to the merits of the issue.
Brief facts pertaining to the impugned addition of payments received towards capacity transfer by the assessee. The Europe India Gateway (‘EIG’) cable is a submarine communications cable system that links the Indian subcontinent and the United Kingdom (UK) with Terminal Stations at various Terminal Points. To develop and lay down this cable, a consortium was formed which included telecom operators from various countries including the assessee. In this regard, an agreement was entered into among the members of the consortium called the Construction and Maintenance (C&MA) Agreement on May 6, 2008 (Page No. 6 of the paperbook), under which the Assessee was allotted 7.1265% stake in the total capacity of the EIG cable system for an investment of USD 50 million. As per the agreement among the consortium members, there is a capacity allocation to each of the consortium members in the EIG cable system. The concerned member of the consortium is entitled to transfer capacity in the EIG cable system, to other telecommunication entities from its allotted capacity on a private basis with the condition that the transferring EIG party
IT(IT)A No.797/Bang/2022 Page 5 of 14
should cause the recipient to comply with the conditions laid down in the C&MA agreement.
Thereafter, the Assessee entered into an EIG capacity transfer agreement with Dishnet Wireless Limited (‘Dishnet’) on March 5, 2009 (Page No. 115 of the paperbook), for participation of Dishnet via the assessee in the EIG consortium wherein Dishnet agreed to share 40% of the overall initial investment of the assessee of USD 50 million, amounting to USD 20 million. By virtue of this participation, the assessee agreed to share 40% of its allocated capacity in the EIG cable with Dishnet over the lifetime of the EIG system. The agreement entered with Dishnet was a private agreement to establish a partnership in relation to the participation in the EIG consortium wherein Dishnet was required to indirectly (i.e. through assessee) share the periodic capital costs incurred with respect to the laying out the EIG cable (upto the total investment limit of USD 20 million) in consideration for the stake allotted to Dishnet in the capacity of the EIG cable under the agreement dated March 5, 2009. The subject under the dispute is on this capacity/bandwidth sharing for use by Dishnet. As per the agreement the assessee received a sum of USD 5,749,961 on August 5, 2009 from Dishnet being the first billing milestone.
During the course of re-assessment proceedings the AO noticed that Authority for Advance Ruling (AAR) had in the case of Dishnet has given a ruling (AAR No.863 dated 24.08.2012) that the payments made by Dishnet to the assessee under the EIG capacity transfer
IT(IT)A No.797/Bang/2022 Page 6 of 14
agreement is chargeable to tax in India as Royalty. The AO held that the AAR ruling is binding in assessee’s case also and accordingly proceeded to add the entire amount of Rs.102 crores (USD 20 Mn) as royalty income in the hands of the assessee. The AO stated that the though the amount of USD 5,749,961 was received by the assessee on August 5, 2009, the cable network became operational in FY 2011-12 relevant to AY 2012-13 and therefore the AO brought to tax the entire amount.
Aggrieved the assessee filed its objections before the DRP. Before the DRP the assessee submitted evidences in support of the receipt of only USD 5,749,961 and also the evidence to substantiate that the cable network became operational from February 2011. The assessee also submitted before the DRP that the AAR ruling is not binding on the assessee. The DRP did not accept the contentions and evidences submitted by the assessee. The DRP upheld the addition by holding that the AAR ruling is binding on AO/DRP which needs to be followed and also that the assessee could not produce any concrete evidence to prove that the assessee has received was only USD 5,749,961. The assessee is in appeal before the Tribunal against the final order of AO passed pursuant to the DRP directions.
The one of the contentions of the ld AR is that there has been no occurrence of any taxable event in the impugned year AY 2012-13 and that the revenue has failed to discharge the onus to show that any income has either arisen or stood received by the assessee during the
IT(IT)A No.797/Bang/2022 Page 7 of 14
year. In this regard the ld AR submitted the table with the list of events as given below to submit that all the milestone events pertaining to the impugned addition did not happen in the year under consideration.
S.No. Event Date Reference 1. Construction & Maintenance May 06, 2008 Pg. 6 of the Agreement(‘EIG Agreement’) Paperbook (i.e., between the Consortium members, which includes the Appellant) 2. Capacity Transfer Agreement March 05, 2009 Pg. 115 of the between the Appellant and Paperbook Dishnet 3. Follow-up email to Dishnet, for July 27, 2009 Pg. 128 of the the pending payment of $5.75 Paperbook Mio. towards the first payment cycle 4. Receipt of $ 5.75 Mio. from August 05, 2009 Email Confirmation Dishnet in Pg. 127 of the Paperbook &Extract of Bank Statement in 130 of the Paperbook 5. Date of Amendment Agreement May 16, 2010 Pg. 132 of the (shared with Dishnet for Paperbook execution vide email dt. May 18, 2010, but the same remained unexecuted) 6. Ready for Service (‘RFS’) date July 2010, OR, Pg. 14 of the as per the EIG Agreement Such other date as Paperbook (i.e., the date on which may be agreed by commercial service can be the Management placed on the EIG cable) Committee 7. Dishnet’s Application to the 2010 - Authority for Advance Ruling (No. 863 of 2010) 8. Date of actual commencement February 2011 Pg. 135 of the of commercial service – i.e., Paperbook Actual RFS 9. Order of the AAR in the case of 24 August 2012 Pg. 227 of the Case Dishnet Law Compendium
IT(IT)A No.797/Bang/2022 Page 8 of 14
The ld AR submitted that the merely based on the AAR ruling in the case of Dishnet has concluded that the assessee has received a sum of USD 20 million from Dishnet for parting with 40% share of the Europe India Gateway cable system, i.e., the EIG cable, with Dishnet, which is in the nature of royalty as a consideration for right to use a process and/or right to use a commercial or scientific equipment and the same is taxable as royalty in the impugned AY. It is further submitted that the view of the Ld. AO that the cable in question was laid in 2009, became operational from FY 11-12 and the payment for this was made in advance, is completely unfounded and devoid of any merit. The ld AR drew our attention the reports of submarinenetworks.com that the services of EIG cable system had commenced during February 2011, which is outside the impugned year and that the assessee had provided affidavit on how the agreement with Dishnet did not crystalize at all. Therefore, it is submitted that notwithstanding that EIG cable system had commenced operation before the impugned year, no service was ever rendered by the assessee to Dishnet. Accordingly the ld AR submitted that no event occurred for taxing the impugned amount during the year under consideration.
Without prejudice to the above, the ld AR submitted that the amount of USD 5,749,961 actually received by the Assessee during the FY 2009-10 cannot be brought to tax in the impugned AY for the
IT(IT)A No.797/Bang/2022 Page 9 of 14
simple reason that the EIG cable system became operational in February 2011 (i.e. FY 2010-11 or AY 2011-12) and not in the year as contended by the AO. The ld AR also submitted that bringing the entire amount of USD 20 Million i.e. Rs.102 crores is unsustainable for the reason that the full amount that was never received by the assessee and therefore cannot be brought under the tax radar. It is submitted that substantial explanation and evidence have been provided as regards the receipt of USD 5.7 Million (the amount and the year of receipt), and further development of annulment of the arrangement between the Assessee and Dishnet. Given this background, the ld AR submitted that there arises no question of bringing into dispute the balance of USD 14.3 Million.
The ld DR on the other had submitted that even assuming that the AAR is not binding on the assessee as contented, the rationale of the ruling is that the impugned amount is a royalty which is taxable in India and accordingly the assessee being in receipt of the said amount is liable to pay tax on the same. The ld DR further submitted that the amount received by the assessee would fall within the provisions of explanation 2 to section 9 and accordingly liable to be taxed in the hands of the assessee.
We heard the rival submissions and perused the material on record. Besides the arguments stating that no taxable event occurred during the year under consideration the ld AR presented arguments raising various other contentions such as receipt being capital in nature,
IT(IT)A No.797/Bang/2022 Page 10 of 14
AAR ruling in the case of Dishnet not binding on the assessee and the royalty even if taxable only on receipt basis not on accrual. For the purpose of adjudication we will consider the submissions made with regard to no taxable event occurred during the year under consideration.
It is noticed that the assessee has entered into an EIG capacity transfer agreement with Dishnet on March 5, 2009 (Page No. 115 of the paper book), for participation of Dishnet via the assessee in the EIG consortium wherein Dishnet agreed to share 40% of the overall initial investment of USD 50 million, amounting to USD 20 million. It is also noticed that the assessee has received a sum of USD 5,749,961 on August 5, 2009 being the first milestone payment. During the course of hearing the ld AR submitted that since the subsequent payments were not coming through inspite of repeated follow up the assessee offered to bring down the liability and the corresponding extent of capacity sharing to Dishnet through an amendment agreement dated May 16, 2010 (Refer Page No. 132 of the Paper book). i.e., to 11.5% from 40%. It is submitted that Dishnet did not execute the revised agreement and no further transactions happened ensued between the assessee and Dishnet since ultimately Dishnet went into insolvency.
We notice that the only basis for making the addition during AY 2012-13 as stated by the AO during the re-assessment proceedings and in the remand report is that the EIG project commenced during the financial year relevant to AY 2012-13 and on that basis concluded that
IT(IT)A No.797/Bang/2022 Page 11 of 14
the entire amount of USDD 20 Million (Rs.102 crores) accrued to the assessee during the impugned year. The relevant observations of the AO in this regard is extracted below –
15.9 The next question is as to when the payment is taxable in India. The said cable in question was laid in 2009 in become operational from FY 2011-12. The payment made originally in advance. The use of the segment commence only in the FY 2011-12 advance payments are taxable in year in which income accrue or arises. The context in which the DTAA used the word received or paid is to ensure that tax liability does not fasten to the non-resident before the actual receipt as these are cross border transaction. By the same parameters the advance may not be taxable till the service is rendered. The advance remains to be a liability till it is adjusted against revenue receipt. This act of adjustment happen only when the service is rendered which is also in consonance with the accounting norms and Indian Law. Therefore, the taxation of this payment as income in the FY 2011-12 relevant to AY 2012-13 is in order based on the facts available in this office. According, the sum of USD 20milion which is translates to RS. 102 Crores is brought to tax as royalty in compliance of the Decision of authority of advance Ruling which is binding in this office.
We also notice that the DRP has not carried out any independent examination of the issue on merits and has confirmed the addition on similar grounds relying on the remand report from the AO by stating that –
21.6 Further during the DRP proceedings the assessee has submitted a few email correspondences with regards to the payment , modification in agreement. Also the assessee has submitted capacity transfer agreement dated 05.03.2009 between assessee and the Dishnet, website extract to
IT(IT)A No.797/Bang/2022 Page 12 of 14
evidence the commencement of the EIG cable systems. The panel has perused the submissions made by the assessee and the order of the AO. We are of the opinion that the assessee could not produce any concrete evidence to prove that it has received only USD 5749,961 and that the EIG project had commenced in FY 2009-10 relevant to AY 2010-11. Mere submission of email correspondence that too one liner does not help the cause of the assessee. Therefore we are of the opinion that the addition made by the AO is correct. Accordingly ground rejected.”
From the above observations of the AO and the DRP it is clear that the revenue has not brought anything on record to substantiate claim that the EIG project commenced during the financial year 2011- 12. The revenue has merely rejected the evidences submitted by the assessee in the form of email correspondence from the Chairman of EIG Management Committee confirming the period of commencement of the EIG cable as February 23, 2011 without any material evidence to prove the contrary. Therefore in our view the claim of the revenue that the taxable event occurred during the impugned year is unsubstantiated. We also see merit in the submission of the ld AR that the assessee cannot be asked to prove the negative fact that no payments are received during the impugned year in the absence of any positive evidence to the contrary. In this regard we notice the observations made by the Hon’ble Supreme Court in the case of K P Varghese v. ITO, [1981] 7 taxman 13 (SC) wherein it is held that “to throw the burden of showing that there is no understatement of the consideration on the assessee would be to cast an almost impossible burden upon him to establish a negative, namely, that he did not
IT(IT)A No.797/Bang/2022 Page 13 of 14
receive any consideration beyond that declared by him”. During the course of hearing, the bench directed the ld DR to obtain a report from the AO on the event/reason which triggered the impugned addition in the year under consideration. On perusal of the report submitted it is noticed that the AO has prayed for 3 months’ time to submit a conclusive report and had not reported any other finding or evidence on the specific query raised by the bench as to the event that triggered the impugned addition in the year under consideration. We are therefore unable appreciate the claim of the revenue that the entire amount as per agreement including amount not received has accrued to the assessee in the assessment year 2012-13 and taxable accordingly in the said assessment year. In view of these discussions and considering the facts of the case we hold that there has been no occurrence of any taxable event in the impugned year AY 2012-13 and therefore there is no basis for making the addition made in the impugned year. We accordingly delete the addition made by the AO on this ground.
In the light of our decision as given above the other arguments submitted, contending the same issue have become academic. Similarly the additional ground raised by the assessee on the validity of the DRP directions being issued without mentioning the DIN in the body of the said directions has also become academic and therefore is left open. Ground No.15 to 17 are consequential.
IT(IT)A No.797/Bang/2022 Page 14 of 14
In result the appeal of the assessee is allowed.
Pronounced in the open court on this 06th day of February, 2023.
Sd/- Sd/-
( N V VASUDEVAN ) ( PADMAVATHY S ) VICE PRESIDENT ACCOUNTANT MEMBER
Bangalore, Dated, the 06th February, 2023. /Desai S Murthy /
Copy to: 1. Assessee 2. Respondent 3. CIT 4. CIT(A) 5. DR, ITAT, Bangalore. By order
Assistant Registrar ITAT, Bangalore.
More judgments on Section 147
- ACIT Central Bilaspur, Bilaspur vs Arun Kumar Agrawal, SaktiITSSA 26/RPR/2025[2018-19]Status: Disposed21 Oct 2026AY 2018-19
- Vinod Agrawal, Kawardha vs Assisstant Commissioner of Income Tax…ITA 666/RPR/2026[2019-20]Status: Heard21 Oct 2026AY 2019-20
- Sar Business Tradelink Private Limited… vs Income Tax Officer, Ward - 1(2), RaipurITA 599/RPR/2026[2014-15]Status: Heard21 Oct 2026AY 2014-15
- Tarunaben Maganlal Bhut, Navagam vs ITO Ward 2(2)(1), RajkotITA 673/RJT/2026[2024-25]Status: Disposed21 Oct 2026AY 2024-25
- Neo Incorporation, Rajkot vs DCIT Circle- 1(2), RajkotITA 471/RJT/2026[2012-2013]Status: Disposed21 Oct 2026AY 2012-2013
Recent GST High Court judgments
Search GST case law →- M/S. Mehra Mac Industries Private Limited vs. The Deputy State Tax OfficerTelangana · 30 Oct 2026
- Santosh Das And Anr. vs. Union Of INDIACalcutta · 30 Oct 2026
- M/S Rama Krishna Industries vs. State Of Hp And OthersHimachal Pradesh · 30 Oct 2026
- Smt Usha W/O Shri Tarun vs. Union Of INDIARajasthan · 29 Oct 2026
- M/S Maruti Nandan Minetech Private Limited vs. The Joint CommissionerRajasthan · 29 Oct 2026