DEPUTY COMMISSIONER OF INCOME TAX CENTRAL CIRCLE-3(4) , MUMBAI vs. PATEL ENGINEERING LTD, MUMBAI
ITA 5269/MUM/2017[2013-14]Status: DisposedITAT Mumbai14 Feb 2018AY 2013-14
Bench: Sri Mahavir Singh, Jm & G. Manjunatha, Am Patel Engineering Ltd. The Dy. Commissioner Of Sv Road, Patel Estate, Income Tax, Cc-3(4),Room Jogeshwari (W), No. 1915, 19Th Floor Air Vs. Mumbai-400102 India Building, Nariman Point, Mumbai-400 021 Appellant .. Respondent Pan No. Aaacp2567L The Dy. Commissioner Of Patel Engineering Ltd. Income Tax, Cc-3(4),Room Sv Road, Patel Estate, No. 1915, 19Th Floor Air India Vs. Jogeshwari (W), Building, Nariman Point, Mumbai-400102 Mumbai-400 021 Appellant .. Respondent
For Appellant: Mayur Kisnadwala, ARFor Respondent: HN Singh, CIT DR
Section 142(1)Section 143(2)Section 143(3)Section 14ASection 234BSection 80I
…the defect liability period, are considered interim payments. While holding so the CIT(A) relied on the decisions of the Hon'ble Bombay High Court in ABG Heavy Industries Ltd. 322 ITR 323 (para 5 of that order), assessee's own case for AY 2000-01 reported in 94 ITD 411 (paras 46 and 47) and Bharat Udyog Ltd. 24 SOT 412 to hold that the assessee is a developer and not a contractor. 7. We had also gone through the tender document filed by the assessee which is placed on record, after analyzing the major clause of the agreement to determine the scope and nature of work undertaken, we found that assessee was a deve…