BharatTax.net
SearchITATHigh CourtsSupreme CourtPhrasesAI ResearchHistory

Filters

BharatTax.net

Free search engine for ITAT (Income Tax Appellate Tribunal) judgments across all 28 benches in India.

Quick Links

  • Search Judgments
  • Browse by Bench
  • Recent Judgments

About

BharatTax provides free access to Income Tax Appellate Tribunal orders for legal research and reference.

© 2026 BharatTax.net. All rights reserved.

41 results for “condonation of delay”+ Section 86clear

Sorted by relevance

Chennai404Mumbai335Kolkata258Delhi249Ahmedabad168Bangalore155Pune139Karnataka126Hyderabad124Jaipur112Chandigarh71Nagpur70Cuttack41Indore38Calcutta37Surat36Visakhapatnam36Cochin32Lucknow23Kerala17Jodhpur14Rajkot14Patna10SC10Guwahati9Amritsar9Raipur8Panaji8Allahabad4Telangana3Agra3Jabalpur2Himachal Pradesh2Varanasi2Rajasthan1Orissa1Andhra Pradesh1A.K. SIKRI N.V. RAMANA1Ranchi1

Key Topics

Section 26373Section 1042Limitation/Time-bar17Charitable Trust17Deduction16Section 143(3)15Section 4014Section 80I13Disallowance

RAVI METALLICS LIMITED,ROURKELA vs. PR.CIT, SAMBALPUR

In the result, appeal of the assessee is allowed

ITA 34/CTK/2021[2014-15]Status: DisposedITAT Cuttack05 Jul 2022AY 2014-15

Bench: Shri George Mathan & Shri Arun Khodpiaravi Metallics Limited, I/10, Civil Township, Rourkela-769004 Pan No.Adqps 4031 G ………………Assessee Versus Pr.Cit, Sambalpur ………………..Revenue Shri P.R.Mohanty, Ar For The Assessee Shri M.K.Gautam, Cit-Dr For The Revenue Date Of Hearing : 30/05/2022 Date Of Pronouncement : 30/05/2022 आदेश / O R D E R Per Bench : This Is An Appeal Filed By The Assessee Against The Order Of The Ld. Pr.Cit, Sambalpur, Passed U/S.263 Of The Act In Case No.Pcit/Sbp/263/26/2018-19, Dated 29.03.2019 For The Assessment Year 2014-2015. Heard On The Question Of Condonation Of Delay 2. On Perusal Of The Record, We Found That The Appeal Of The Assessee Is Barred By 686 Days. In This Regard, Ld. Ar Filed An Application Along With Affidavit For Condonation Of Delay, Wherein It Has Been Submitted That The Delay Occurred In Filing The Present Appeal Is Neither Intentional Nor Deliberate But Due To Unfortunate & Unavoidable Circumstances Beyond

Section 253Section 263

delay in filing the appeal stands condoned and the appeal is admitted for hearing. Heard on the merits of the appeal 7. Now, we shall proceed to decide the appeal of the assessee challenging the order passed u/s.263 of the Act. 8. It was submitted by the ld. AR that the Pr.CIT has invoked his powers u/s.263

Showing 1–20 of 41 · Page 1 of 3

13
Section 26012
Section 143(1)11
Addition to Income11

SANGRAM KESHARI SAMANTARAY,BHUBANESWAR vs. PRINCIPAL COMMISSIONER OF INCOME TAX-2, BHUBANESWAR

ITA 12/CTK/2020[2012-13]Status: DisposedITAT Cuttack28 Oct 2021AY 2012-13
For Appellant: Shri D.Parida/C.Parida, ARFor Respondent: Shri M.K.Gautam, CITDR
Section 143(3)Section 147Section 263

condone the delay of 224 days in filing the present appeal and the appeal is heard on merits. 4. The assessee has raised following grounds of appeal:- 1. That the order passed by the Learned Pr. Commissioner of Income Tax-2, Bhubaneswar u/s 263 of the LT. Act, 1961 is excessive, arbitrary and bad in law. 2. That

M/S. WESTERN ELECTRICITY SUPPLY COMPANY OF ORISSA LTD.,SAMBALPUR vs. ACIT, CIRCLE-1(2), BHUBANESWAR

In the result, appeals of both the assessees stand partly allowed

ITA 220/CTK/2020[2013-14]Status: DisposedITAT Cuttack01 Feb 2023AY 2013-14
For Appellant: Shri P.V.Rao/Sidharth Ranjan, CAsFor Respondent: Shri M.K.Gautam, CIT-DR
Section 19

condone the delay of respective days in respective appeals of the assessee being M/s North Eastern Electricity Supply Co. Ltd. and appeals are heard along with other assessee i.e. M/s Western Electricity Supply Co. Ltd. finally. 3. It was submitted by the ld. AR that the main issue in both the assessee’s appeals is against the action

M/S. NORTH EASTERN ELECTRICITY SUPPLY COMPANY OF ODISHA LIMITED,BHUBANESWAR vs. ACIT, CIRCLE-1(2), BHUBANESWAR

In the result, appeals of both the assessees stand partly allowed

ITA 17/CTK/2019[2013-14]Status: DisposedITAT Cuttack01 Feb 2023AY 2013-14
For Appellant: Shri P.V.Rao/Sidharth Ranjan, CAsFor Respondent: Shri M.K.Gautam, CIT-DR
Section 19

condone the delay of respective days in respective appeals of the assessee being M/s North Eastern Electricity Supply Co. Ltd. and appeals are heard along with other assessee i.e. M/s Western Electricity Supply Co. Ltd. finally. 3. It was submitted by the ld. AR that the main issue in both the assessee’s appeals is against the action

M/S. NORTH ELECTRICITY SUPPLY COMPANY OF ODISHA,BHUBANESWAR vs. ACIT,CIRCLE-1(2), BHUBANESWAR

In the result, appeals of both the assessees stand partly allowed

ITA 16/CTK/2019[2011-12]Status: DisposedITAT Cuttack01 Feb 2023AY 2011-12
For Appellant: Shri P.V.Rao/Sidharth Ranjan, CAsFor Respondent: Shri M.K.Gautam, CIT-DR
Section 19

condone the delay of respective days in respective appeals of the assessee being M/s North Eastern Electricity Supply Co. Ltd. and appeals are heard along with other assessee i.e. M/s Western Electricity Supply Co. Ltd. finally. 3. It was submitted by the ld. AR that the main issue in both the assessee’s appeals is against the action

WESTERN ELECTRICITY SUPPLY COMPANY OF ORISSA LTD.,SAMBALPUR vs. ACIT, CIRCLE-1(2), BHUBANESWAR

In the result, appeals of both the assessees stand partly allowed

ITA 125/CTK/2018[2011-12]Status: DisposedITAT Cuttack01 Feb 2023AY 2011-12
For Appellant: Shri P.V.Rao/Sidharth Ranjan, CAsFor Respondent: Shri M.K.Gautam, CIT-DR
Section 19

condone the delay of respective days in respective appeals of the assessee being M/s North Eastern Electricity Supply Co. Ltd. and appeals are heard along with other assessee i.e. M/s Western Electricity Supply Co. Ltd. finally. 3. It was submitted by the ld. AR that the main issue in both the assessee’s appeals is against the action

SRI BADAL CHANDRA SENAPATI,BALASORE vs. ITO, WARD-2, BALASORE

In the result, the appeal filed by the assessee is partly allowed

ITA 422/CTK/2016[2011-12]Status: DisposedITAT Cuttack31 Jan 2017AY 2011-12

Bench: Shri N.S Sainiassessment Year :2010-11

For Appellant: Shri P.K.Mishra, ARFor Respondent: Shri D.K.Pradhan, DR

condone the delay of 221 days in filing the appeal before the Tribunal and admit the appeal for hearing. 3. Ground Nos.1,7 & 8 of the appeal are general in nature and hence, requires no separate adjudication by me. 4. In Ground No.2 of the appeal, the grievance of the assessee is that the CIT(A) should not have confirmed

BAITARANI GRAMYA BANK,BHUBANESWAR vs. ACIT, BALASORE

In the result, appeal is partly allowed

ITA 318/CTK/2013[2008-09]Status: DisposedITAT Cuttack24 Aug 2017AY 2008-09

Bench: S/Shri N.S Saini & Pavan Kumar Gadale

For Appellant: Shri B.K.Mohapatra, ARFor Respondent: Shri D.K.Pradhan, DR
Section 36(1)(vii)Section 36(1)(viia)

condone the delay of 127 days in filing the appeal before the Tribunal and admit the appeal for hearing. 3. Ground No.1 is general in nature and hence, requires no separate adjudication by us. 4. Ground No.4 of the appeal is not pressed by ld A.R. of the assessee, hence, same is dismissed as not pressed. 5. In Ground No.2

REGIONAL PLANT RESOURCE CENTRE,BHUBANESWAR vs. ITO, EXEMPTION WARD, BHUBANESWAR, BHUBANESWAR

In the result, appeal filed by the assessee stand allowed

ITA 2/CTK/2024[2016-17]Status: DisposedITAT Cuttack11 Jun 2024AY 2016-17

Bench: Before Shri George Mathan, Judicial & Manish Agarwal Manish Agarwalassessment Year : 2016-17 Regional Regional Plant Plant Resource Resource Vs. Ito, Ito, Exemption Exemption Ward, Ward, Centre, Centre, Rprc, Rprc, Nayapalli, Nayapalli, Bhubaneswar Bhubaneswar Irc Village, Bhubaneswar Irc Village, Bhubaneswar Pan/Gir No Pan/Gir No.Aabar 5992 A (Appellant (Appellant) .. ( Respondent Respondent) Assessee By : Shri B.R.Pattnaik B.R.Pattnaik, Ca Revenue By : Shri Charan Dass, Sr Charan Dass, Sr Dr Date Of Hearing : 11/0 06/2024 Date Of Pronouncement : 11/0 /06/2024 O R D E R Per Bench This Is An Appeal Filed By The Assessee Against The Order Of The Ld This Is An Appeal Filed By The Assessee Against The Order Of The Ld This Is An Appeal Filed By The Assessee Against The Order Of The Ld Cti(A), Nfac, Delhi Cti(A), Nfac, Delhi Dated 30.11.2022 In Appeal No. Cit( Cit(A), Bhuabenswar- 3/10003/2019 3/10003/2019-20 For The Assessment Year 2016-17. 2. Shri B.R.Pattnaik, B.R.Pattnaik, Ld Ar Appeared For The Assessee & Shri The Assessee & Shri Charan Dass, Ld Sr. Dr Appeared For The Revenue. Dr Appeared For The Revenue.

For Appellant: Shri B.R.PattnaikFor Respondent: Shri Charan Dass, Sr
Section 143(1)

condone the delay of 339 days and admit the appeal for adjudication. 4. It was submitted by ld AR that this is an appeal against the order u/s.143(1) of the Act issued by the CPC. It was the submission that as per the provisions of section 143(1), before making any adjustment, a show cause notice

BHAVENDRA HASMUKHLAL PATADIA. LEGAL HEIR OF HASMUKHLAL PATADIA.,CUTTACK vs. ITO WARD-!(1), CUTTACK

In the result, appeal of the assessee is allowed

ITA 125/CTK/2022[2015-16]Status: DisposedITAT Cuttack26 Dec 2022AY 2015-16

Bench: Shri George Mathan & Shri Arun Khodpiaआयकर अऩीऱ सं/Ita No.125/Ctk/2022 (ननधाारण वषा / Assessment Year :2015-2016) Bhavendra Hasmukhlal Patadia, Vs Ito, Ward-1(1), Cuttack Legal Heir Of Hasmukhlal Patadia, Nayabazar, Chauliaganj, Cuttack-753004 Pan No. :Adapp 6256 G (अऩीऱाथी /Appellant) .. (प्रत्यथी / Respondent) ननधााररती की ओर से /Assessee By : Shri Deepak Shah, Ar राजस्व की ओर से /Revenue By : Shri M.K.Gautam, Cit-Dr सुनवाई की तारीख / Date Of Hearing : 26/12/2022 घोषणा की तारीख/Date Of Pronouncement : 26/12/2022 आदेश / O R D E R Per Bench : This Is An Appeal Filed By The Assessee Against The Order Of The Ld Pr.Cit, Cuttack, Passed In Itba/Com/F/17/2019-20/1026790827(1), Dated 19.03.2020, For The Assessment Year 2015-2016. Head On The Question Of Condonation Of Delay 2. On Perusal Of The Appeal Record, It Is Found That The Appeal Of The Assessee Is Barred By 784 Days. In This Regard, The Assessee Has Filed An Application For Condonation Of Delay Dated 11.07.2022 Along With Affidavit Stating Therein That Due To Continuous Lockdown On Account Of Spread Of Covid-19, The Assessee Could Not File The Present Appeal In Time, Therefore, He Prayed That Delay Of 784 Days In Filing The Present Appeal May Kindly Be Condoned. On The Other Hand, Ld. Cit-Dr Did Not Object To The Above Submission Of The Ld. Ar. Considering The Above, We Condone

For Appellant: Shri Deepak Shah, ARFor Respondent: Shri M.K.Gautam, CIT-DR
Section 143(3)Section 263

condone 2 the delay of 784 days in filing the present appeal by the assessee and appeal is heard finally. 3. It was submitted by the ld. AR that the assessee is an individual, who derives income from letting out of house property and income from share transaction. The assessee had filed its return of income

DCIT,CORPORATE CIRCLE-1(1), BHUBANESWAR vs. M/SD. SRB CONSULTANCY (P) LIMITED, BHUBANESWAR

In the result, appeal of the revenue is dismissed and cross objections of the assessee are partly allowed

ITA 11/CTK/2021[2017-18]Status: DisposedITAT Cuttack17 May 2022AY 2017-18

Bench: Before S/Shri George Mathan, Judicial & Arun Khodpia & Arun Khodpia & Arun Khodpia

For Appellant: Shri Dillip Kumar MohantyFor Respondent: Shri S.K.Mohapatra
Section 24Section 68Section 69Section 80Section 80I

Section 68, being just 86 proper be upheld 8& the departmental ground on this account be dismissed. 3. For that even if assuming but not admitting that as held by the CIT (A) the disclosed receipt of Rs. 29,61,593/- disclosed under the head business income voluntarily are to be treated as rental income under the head "Income from

SHREE BALAJI ENGICONS PVT. LTD,JHARSUGUDA vs. PRINCIPAL CIT, SAMBALPUR

In the result, appeal of the assessee in ITA No

ITA 195/CTK/2019[204-15]Status: DisposedITAT Cuttack15 Dec 2021

Bench: Shri C.M. Garg, Jm & Shri Manish Borad, Am आयकर अपीऱ सं./Ita Nos.193/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) M/S Rawats-Balaji(Jv), Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aabar 9061 J Tan No. : Bbnr01647 C & आयकर अपीऱ सं./Ita Nos.194/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) M/S Sbepl-Gril(Jv), Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aafas 2639 R Tan No. : Bbns04348 B & आयकर अपीऱ सं./Ita Nos.195/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) Shree Balaji Engicons Pvt Ltd Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aagcs 4292 P Tan No. : Bbns00091 A (अऩीलाथी /Appellant) (प्रत्यथी / Respondent) .. ननधाारिती की ओर से /Assessee By : Shri Satyanarayan Agarwal, Ar िाजस्व की ओर से /Revenue By : Shri M.K.Gautam, Citdr सुनवाई की तािीख / Date Of Hearing : 26/10/2021 घोषणा की तािीख/Date Of Pronouncement : 23/12/2021 आदेश / O R D E R Per Bench: These Three Appeals Have Been Filed By Three Different Assessees Against The Order Passed By The Pr.Cit, Sambalpur, U/S.263 Of The Act, All Dated 30.03.2019 For The Assessment Year 2014-2015. 2

For Appellant: Shri Satyanarayan Agarwal, ARFor Respondent: Shri M.K.Gautam, CITDR
Section 143(3)Section 14ASection 263Section 80I

condone the delay and admit all the three appeals for adjudication. 4. Since similar and identical issues involved in all the three appeals of the assessees, therefore they are heard altogether and disposed off by this consolidated order en masse. 5. Ld. Assessee‟s Representative (AR) drew our attention towards two paper books of the assessee spread over 475 pages

M/S- SBEP-GRIL(JOINT VENTURE),JHARSUGUDA vs. PRINCIPAL CIT, SAMBALPUR

In the result, appeal of the assessee in ITA No

ITA 194/CTK/2019[2014-15]Status: DisposedITAT Cuttack15 Dec 2021AY 2014-15

Bench: Shri C.M. Garg, Jm & Shri Manish Borad, Am आयकर अपीऱ सं./Ita Nos.193/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) M/S Rawats-Balaji(Jv), Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aabar 9061 J Tan No. : Bbnr01647 C & आयकर अपीऱ सं./Ita Nos.194/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) M/S Sbepl-Gril(Jv), Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aafas 2639 R Tan No. : Bbns04348 B & आयकर अपीऱ सं./Ita Nos.195/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) Shree Balaji Engicons Pvt Ltd Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aagcs 4292 P Tan No. : Bbns00091 A (अऩीलाथी /Appellant) (प्रत्यथी / Respondent) .. ननधाारिती की ओर से /Assessee By : Shri Satyanarayan Agarwal, Ar िाजस्व की ओर से /Revenue By : Shri M.K.Gautam, Citdr सुनवाई की तािीख / Date Of Hearing : 26/10/2021 घोषणा की तािीख/Date Of Pronouncement : 23/12/2021 आदेश / O R D E R Per Bench: These Three Appeals Have Been Filed By Three Different Assessees Against The Order Passed By The Pr.Cit, Sambalpur, U/S.263 Of The Act, All Dated 30.03.2019 For The Assessment Year 2014-2015. 2

For Appellant: Shri Satyanarayan Agarwal, ARFor Respondent: Shri M.K.Gautam, CITDR
Section 143(3)Section 14ASection 263Section 80I

condone the delay and admit all the three appeals for adjudication. 4. Since similar and identical issues involved in all the three appeals of the assessees, therefore they are heard altogether and disposed off by this consolidated order en masse. 5. Ld. Assessee‟s Representative (AR) drew our attention towards two paper books of the assessee spread over 475 pages

M/S- RAWAT BALAJI (JOINT VENTURE),JHARSUGUDA vs. PRILNCIPAL, CIT, SAMBALPUR

In the result, appeal of the assessee in ITA No

ITA 193/CTK/2019[204-15]Status: DisposedITAT Cuttack15 Dec 2021

Bench: Shri C.M. Garg, Jm & Shri Manish Borad, Am आयकर अपीऱ सं./Ita Nos.193/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) M/S Rawats-Balaji(Jv), Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aabar 9061 J Tan No. : Bbnr01647 C & आयकर अपीऱ सं./Ita Nos.194/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) M/S Sbepl-Gril(Jv), Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aafas 2639 R Tan No. : Bbns04348 B & आयकर अपीऱ सं./Ita Nos.195/Ctk/2019 (नििाारण वषा / Assessment Year :2014-2015) Shree Balaji Engicons Pvt Ltd Vs Pr.Cit, Sambalpur At/Po-Belpahar(Rs), Dist : Jharsuguda Pan No. : Aagcs 4292 P Tan No. : Bbns00091 A (अऩीलाथी /Appellant) (प्रत्यथी / Respondent) .. ननधाारिती की ओर से /Assessee By : Shri Satyanarayan Agarwal, Ar िाजस्व की ओर से /Revenue By : Shri M.K.Gautam, Citdr सुनवाई की तािीख / Date Of Hearing : 26/10/2021 घोषणा की तािीख/Date Of Pronouncement : 23/12/2021 आदेश / O R D E R Per Bench: These Three Appeals Have Been Filed By Three Different Assessees Against The Order Passed By The Pr.Cit, Sambalpur, U/S.263 Of The Act, All Dated 30.03.2019 For The Assessment Year 2014-2015. 2

For Appellant: Shri Satyanarayan Agarwal, ARFor Respondent: Shri M.K.Gautam, CITDR
Section 143(3)Section 14ASection 263Section 80I

condone the delay and admit all the three appeals for adjudication. 4. Since similar and identical issues involved in all the three appeals of the assessees, therefore they are heard altogether and disposed off by this consolidated order en masse. 5. Ld. Assessee‟s Representative (AR) drew our attention towards two paper books of the assessee spread over 475 pages

DCIT, CORPORATE CIRCLE- 1(1), BHUBANESWAR vs. M/S. GRID CORPORATION OF ORISSA LTD., BHUBANESWAR

In the result, both the appeals of the assessee stand allowed

ITA 359/CTK/2019[2014-15]Status: DisposedITAT Cuttack29 Mar 2023AY 2014-15

Bench: Before S/Shri George Mathan, Judicial & Arun Khodpia & Arun Khodpia & Arun Khodpiaita Nos.34 & 35/Ctk/2019 2019 Assessment Assessment Years : 2013-14 & 2014 14 & 2014-15 M/S. Grid Corporation Of M/S. Grid Corporation Of Vs. Dcit, Circle Dcit, Circle -1(1), Orissa Ltd., Gridco House, Orissa Ltd., Gridco House, Bhubaneswar. Bhubaneswar. Janpath, Bhubaneswar Janpath, Bhubaneswar. Pan/Gir No. Pan/Gir No.Aabcg 5398 P (Appellant (Appellant) .. ( Respondent Respondent)

For Appellant: Shri Ved Jain & Shri Venugopal Rao, ARsFor Respondent: Shri M.K.Gautam, Pr. CIT (OSD)
Section 115Section 143(3)Section 263Section 40

condone the delay of 269 days and admit the appeals for hearing on merits. 4. It was submitted by ld AR that for the assessment year 2013-14, the original assessment came to be completed u/s.143(3) on 19.2.2016 and for assessment year 2014-15 on 26.2.2016. For the assessment year 2013-14, the Pr. CIT initiated proceedings u/s.263

M/S. GRID CORPORATION OF ORISSA LIMITED,BHUBANESWAR vs. DCIT, CIRCLE-1(1), BHUBANSWAR

In the result, both the appeals of the assessee stand allowed

ITA 325/CTK/2019[2014-15]Status: DisposedITAT Cuttack29 Mar 2023AY 2014-15

Bench: Before S/Shri George Mathan, Judicial & Arun Khodpia & Arun Khodpia & Arun Khodpiaita Nos.34 & 35/Ctk/2019 2019 Assessment Assessment Years : 2013-14 & 2014 14 & 2014-15 M/S. Grid Corporation Of M/S. Grid Corporation Of Vs. Dcit, Circle Dcit, Circle -1(1), Orissa Ltd., Gridco House, Orissa Ltd., Gridco House, Bhubaneswar. Bhubaneswar. Janpath, Bhubaneswar Janpath, Bhubaneswar. Pan/Gir No. Pan/Gir No.Aabcg 5398 P (Appellant (Appellant) .. ( Respondent Respondent)

For Appellant: Shri Ved Jain & Shri Venugopal Rao, ARsFor Respondent: Shri M.K.Gautam, Pr. CIT (OSD)
Section 115Section 143(3)Section 263Section 40

condone the delay of 269 days and admit the appeals for hearing on merits. 4. It was submitted by ld AR that for the assessment year 2013-14, the original assessment came to be completed u/s.143(3) on 19.2.2016 and for assessment year 2014-15 on 26.2.2016. For the assessment year 2013-14, the Pr. CIT initiated proceedings u/s.263

DCIT, CORPORATE CIRCLE- 1(1), BHUBANESWAR vs. M/S. GRID CORPORATION OF ORISSA LTD., BHUBANESWAR

In the result, both the appeals of the assessee stand allowed

ITA 358/CTK/2019[2013-14]Status: DisposedITAT Cuttack29 Mar 2023AY 2013-14

Bench: Before S/Shri George Mathan, Judicial & Arun Khodpia & Arun Khodpia & Arun Khodpiaita Nos.34 & 35/Ctk/2019 2019 Assessment Assessment Years : 2013-14 & 2014 14 & 2014-15 M/S. Grid Corporation Of M/S. Grid Corporation Of Vs. Dcit, Circle Dcit, Circle -1(1), Orissa Ltd., Gridco House, Orissa Ltd., Gridco House, Bhubaneswar. Bhubaneswar. Janpath, Bhubaneswar Janpath, Bhubaneswar. Pan/Gir No. Pan/Gir No.Aabcg 5398 P (Appellant (Appellant) .. ( Respondent Respondent)

For Appellant: Shri Ved Jain & Shri Venugopal Rao, ARsFor Respondent: Shri M.K.Gautam, Pr. CIT (OSD)
Section 115Section 143(3)Section 263Section 40

condone the delay of 269 days and admit the appeals for hearing on merits. 4. It was submitted by ld AR that for the assessment year 2013-14, the original assessment came to be completed u/s.143(3) on 19.2.2016 and for assessment year 2014-15 on 26.2.2016. For the assessment year 2013-14, the Pr. CIT initiated proceedings u/s.263

M/S. GRID CORPORATION OF ORISSA LIMITED,BHUBANESWAR vs. DCIT, CIRCLE-1(1), BHUBANSWAR

In the result, both the appeals of the assessee stand allowed

ITA 35/CTK/2019[2014-15]Status: DisposedITAT Cuttack29 Mar 2023AY 2014-15

Bench: Before S/Shri George Mathan, Judicial & Arun Khodpia & Arun Khodpia & Arun Khodpiaita Nos.34 & 35/Ctk/2019 2019 Assessment Assessment Years : 2013-14 & 2014 14 & 2014-15 M/S. Grid Corporation Of M/S. Grid Corporation Of Vs. Dcit, Circle Dcit, Circle -1(1), Orissa Ltd., Gridco House, Orissa Ltd., Gridco House, Bhubaneswar. Bhubaneswar. Janpath, Bhubaneswar Janpath, Bhubaneswar. Pan/Gir No. Pan/Gir No.Aabcg 5398 P (Appellant (Appellant) .. ( Respondent Respondent)

For Appellant: Shri Ved Jain & Shri Venugopal Rao, ARsFor Respondent: Shri M.K.Gautam, Pr. CIT (OSD)
Section 115Section 143(3)Section 263Section 40

condone the delay of 269 days and admit the appeals for hearing on merits. 4. It was submitted by ld AR that for the assessment year 2013-14, the original assessment came to be completed u/s.143(3) on 19.2.2016 and for assessment year 2014-15 on 26.2.2016. For the assessment year 2013-14, the Pr. CIT initiated proceedings u/s.263

M/S GRID CORPORATION OF ORISSA LTD.,BHUBANESWAR vs. DCIT, CIRCLE-1(1), BHUBANESWAR

In the result, both the appeals of the assessee stand allowed

ITA 324/CTK/2019[2013-14]Status: DisposedITAT Cuttack29 Mar 2023AY 2013-14

Bench: Before S/Shri George Mathan, Judicial & Arun Khodpia & Arun Khodpia & Arun Khodpiaita Nos.34 & 35/Ctk/2019 2019 Assessment Assessment Years : 2013-14 & 2014 14 & 2014-15 M/S. Grid Corporation Of M/S. Grid Corporation Of Vs. Dcit, Circle Dcit, Circle -1(1), Orissa Ltd., Gridco House, Orissa Ltd., Gridco House, Bhubaneswar. Bhubaneswar. Janpath, Bhubaneswar Janpath, Bhubaneswar. Pan/Gir No. Pan/Gir No.Aabcg 5398 P (Appellant (Appellant) .. ( Respondent Respondent)

For Appellant: Shri Ved Jain & Shri Venugopal Rao, ARsFor Respondent: Shri M.K.Gautam, Pr. CIT (OSD)
Section 115Section 143(3)Section 263Section 40

condone the delay of 269 days and admit the appeals for hearing on merits. 4. It was submitted by ld AR that for the assessment year 2013-14, the original assessment came to be completed u/s.143(3) on 19.2.2016 and for assessment year 2014-15 on 26.2.2016. For the assessment year 2013-14, the Pr. CIT initiated proceedings u/s.263

M/S. GRID CORPORATION OF ORISSA LIMITED,BHUBANESWAR vs. DCIT, CIRCLE-1(1), BHUBANSWAR

In the result, both the appeals of the assessee stand allowed

ITA 34/CTK/2019[2013-14]Status: DisposedITAT Cuttack29 Mar 2023AY 2013-14

Bench: Before S/Shri George Mathan, Judicial & Arun Khodpia & Arun Khodpia & Arun Khodpiaita Nos.34 & 35/Ctk/2019 2019 Assessment Assessment Years : 2013-14 & 2014 14 & 2014-15 M/S. Grid Corporation Of M/S. Grid Corporation Of Vs. Dcit, Circle Dcit, Circle -1(1), Orissa Ltd., Gridco House, Orissa Ltd., Gridco House, Bhubaneswar. Bhubaneswar. Janpath, Bhubaneswar Janpath, Bhubaneswar. Pan/Gir No. Pan/Gir No.Aabcg 5398 P (Appellant (Appellant) .. ( Respondent Respondent)

For Appellant: Shri Ved Jain & Shri Venugopal Rao, ARsFor Respondent: Shri M.K.Gautam, Pr. CIT (OSD)
Section 115Section 143(3)Section 263Section 40

condone the delay of 269 days and admit the appeals for hearing on merits. 4. It was submitted by ld AR that for the assessment year 2013-14, the original assessment came to be completed u/s.143(3) on 19.2.2016 and for assessment year 2014-15 on 26.2.2016. For the assessment year 2013-14, the Pr. CIT initiated proceedings u/s.263